Southern Pacific Switching Layout
Justin,

Do you mean that it didn't look right in the track plan or it didn't look right when you laid it out? If you didn't lay them out, photocopy the track and lay them out on the benchwork to double check the track visually.

I think that Stein is onto something. Remember, the line is a former mainline and the spur to the container company would diverge from the mainline. If the curve doesn't look kosher, consider putting some small buildings between the layout edge and the track. At slow switching speeds, you won't have any problems.
Mike Kieran
Port Able Lines

" If the world were perfect, it wouldn't be " - Yogi Berra.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)