A Look At Slate Creek.
#64
Guys,I'll use the Palmetto Spur as a guide since the plan is already spoken for but,it will be very similar to Ed's reverse Palmetto Spur plan with some personal tweaks.

As of now I have all the needed Peco switches and half the needed Micro Engineering flex track.The reason I'm behind is because I decided against using C80 (looked to large for industrial track) and I changed mid steam to C55-thankfully I can use the C80 flex that I ordered at the N Scale club.

Here's a plan I did based on my old "Pine Street Industrial" ISL that I built in '95.It was a fun to operate layout that gave me about 3 years of operation enjoyment..I sold this layout in '98.

[Image: SCRV1.jpg]
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)