Peanut Processing Plant
#7
Ed, just for the heck of it I set up that track-plan on one of my Hollow-core doors, my version fits well in 80 inches even with Peco long turnouts.

I was wondering what type of building would be used when loading peanuts onto boxcars, would it need a warehouse? or would they load them on using forklifts or something similar?
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)