Canadian Pacific 2-8-0 Kitbash
#44
Last shots before Christmas...

I resized the tender frame. The operation was straightforward, but I must admit I used CAD to decided where I would make the cuts. Some putty will be needed to completely hide the scars. Then, I'll work on the serious things: making the coal bunker and add details.

The original underframe with the kitbashed tender (I also removed a lot of things from the shell, including the fireman platform). I want to keep the same weight and their screw-mounted plastic pin.

[Image: 3759090b.jpg]
[Image: 3759091b.jpg]

The tender shell is ready to be redetailled.

[Image: 3759092b.jpg]

Underframe ends in place, only need to resize the middle part.

[Image: 3759093b.jpg]
[Image: 3759094b.jpg]

Completed underframe:

[Image: 3759095b.jpg]
[Image: 3759096b.jpg]

Testing how everything works together. As pointed out by Russ, the cab will need a little grinding to accommodate the tender.

[Image: 3759097b.jpg]
[Image: 3759100b.jpg]

Merry Christmas everybody!

Matt
Proudly modelling Quebec Railway Light & Power Company since 1997.

Hedley-Junction Club Layout: http://www.hedley-junction.blogspot.com/

Erie 149th Street Harlem Station http://www.harlem-station.blogspot.com/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)