Texas Southeast Belt
#6
Spent Friday evening and Saturday putting the foam sheeting on the HCD panels. I picked up two 4' x 8' x 3/4" sheets of Dow blue foam and a couple tubes of foam adhesive for the job. I'm using 3/4" thick foam mainly because its about all you can get in this part of the country without a special order. Plus, the layout is relatively flat and if need be, I can always use an added layer or two of foam to build ground contours.

Apply foam adhesive to the HCD panel...
[Image: IMG_1707.JPG]

Add the foam sheeting...
[Image: IMG_1708.JPG]

Clamp and weight it down to dry...
[Image: IMG_1709.JPG]

On to the next section...
[Image: IMG_1710.JPG]

Finished product...
[Image: IMG_1713.JPG]

A little more trimming, fitting, and filling and that'll just about wrap up the benchwork. Next I'll be painting the backdrop. With that, I should be ready to start some track work in the next couple of weeks . The track plan is coming along and should be up soon.

As always, your comments, critique, and feedback are appreciated!
Len Turner
Texas South East RR
http://tserr.blogspot.com/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)