Peco 3 way turnout
#2
I have one in HO. It works well for the limited use I give it.
I think the N one is a slightly different design, with the points staggered instead of right opposite. For one of the curved routes, both points have to be thrown.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)