Deerfield Beach, FL
#26
Alcanman I really like your new layout especially the inclusion of a run around track which gives an "out and back" flavor to the operation. While there is much to be said for simple shove-switching layouts I always include either a run around or balloon track to provide a feeling of arriving at a switching location, performing the work and then departing back the way I came.
Having worked countless switching areas where this is normal I find it more prototypical than the short shove ones unless a caboose is part of the operation. As a conductor, riding the end of a freight car for long distances (a mile of more) having to protect crossings and make sure switches are lined for my movement tires you out easily and can lead to potential injuries. A caboose first or run around operation is much safer.

Barry
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)