02-04-2009, 11:06 PM
Glued the Pipe connecting from the top of the Furnace to the Gas Collector.
Step 36
Glued the yellow Railings in place on the upper Elevator Platform. I have to touch up the side of the Elevator. This part of the Blast Furnace is now complete. Next will be the conveyor to the top of the Furnace and the Bridge for the hopper cars to drive over.
Step 36
Glued the yellow Railings in place on the upper Elevator Platform. I have to touch up the side of the Elevator. This part of the Blast Furnace is now complete. Next will be the conveyor to the top of the Furnace and the Bridge for the hopper cars to drive over.