L&N Industrial Rail Spur
FCIN Wrote:
hyawn Wrote:Ed:
Any progress on the layout ?
Howard
Afraid not Howard. I'm completely bogged down with another project and will probably be some time before I can get back to doing some relaxing work on the layout. Do have the proposed track arrangement temporarily pinned in place and operate it, maybe once a week, but as far as getting any real work done on the layout; it will probably be the first of the year. But thanks for asking.

Ed,I understand being bogged down by other projects..I'm currently in the "back shop" mode doing the back burner repair jobs.

I have built 3 of the 4 buildings needed for Slate Creek and currently awaiting the 4th building the Walthers Plastic Pellet Storage kit.
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)