01-06-2013, 04:46 PM
Here's a closer-in view of the switch machine, switch heater, and signal bungalow in their final locations. I still need to add more ballast in the area, plus vegetation and other details to the backs of the structures here. The flat area on the left is where the base for the BLMA signal gantry will go.
The foreground track is going to be replaced with concrete ties.
The foreground track is going to be replaced with concrete ties.