03-14-2013, 03:49 PM
Ok so here is the next attempt at the concrete, this just a sample to test the method:
![[Image: 20130314_214443_zpsb7691aa8.jpg]](http://i208.photobucket.com/albums/bb161/jhockuk/20130314_214443_zpsb7691aa8.jpg)
This time I built the area upt to just below the track level, I then used the grout to cove the area and pointed with the Woodland scenics top coat concrete, I think it worked OK, opinions welcome.
![[Image: 20130314_214443_zpsb7691aa8.jpg]](http://i208.photobucket.com/albums/bb161/jhockuk/20130314_214443_zpsb7691aa8.jpg)
This time I built the area upt to just below the track level, I then used the grout to cove the area and pointed with the Woodland scenics top coat concrete, I think it worked OK, opinions welcome.