03-22-2013, 09:13 AM
Work continues on the lumber yard, I have now painted the grout with WS topcoat concrete and I have started to add the expansion joints to the concrete.
![[Image: 20130322_150728_zpsb630adab.jpg]](http://i208.photobucket.com/albums/bb161/jhockuk/20130322_150728_zpsb630adab.jpg)
These are only in pencil at present, once I am happy I will go over them in black marker. Not sure how the expansion joints should work, these are spaced at 25 scale feet intervals, once this done I wash the whole area with Sepia wash and exaggerate some of the cracks in the grout.
Not being from the US I would appreciate some input as to if this realistic for concrete yard area?
![[Image: 20130322_150728_zpsb630adab.jpg]](http://i208.photobucket.com/albums/bb161/jhockuk/20130322_150728_zpsb630adab.jpg)
These are only in pencil at present, once I am happy I will go over them in black marker. Not sure how the expansion joints should work, these are spaced at 25 scale feet intervals, once this done I wash the whole area with Sepia wash and exaggerate some of the cracks in the grout.
Not being from the US I would appreciate some input as to if this realistic for concrete yard area?