06-02-2013, 06:27 PM
Next up, the KP&W short run to serve the team track and Sal's Salvage.
The empty gon to be set out..
and the loaded gon to be picked up...
...and the boxcar staged on the team track to be picked up.
The switcher will take the empty gon with it, pull the boxcar at the team track and then exchange gons at Sal's Salvage, bringing a loaded gon and an empty boxcar to the Float Yard.
The empty gon to be set out..
and the loaded gon to be picked up...
...and the boxcar staged on the team track to be picked up.
The switcher will take the empty gon with it, pull the boxcar at the team track and then exchange gons at Sal's Salvage, bringing a loaded gon and an empty boxcar to the Float Yard.