08-17-2009, 12:38 AM
Some more finetuning of the layout:
One with lots of trackwork, a fairly extensive engine maintenance facility and a reworked station area on the left side.
Pro: lots of places with action.
Con: need to buy another 10 switches.
Or less track, with the double track on the left side and one industry (only serviceable by driving a train directly from the traverser) removed, again the simplified maintenance area, a possible place for a small station on the right hand module (where the engine plus four green car train is parked) and generally more room for scenery. Pro: less pointwork for easier operation and longer trains possible. Con: uh, less track?
One with lots of trackwork, a fairly extensive engine maintenance facility and a reworked station area on the left side.
Pro: lots of places with action.
Con: need to buy another 10 switches.
Or less track, with the double track on the left side and one industry (only serviceable by driving a train directly from the traverser) removed, again the simplified maintenance area, a possible place for a small station on the right hand module (where the engine plus four green car train is parked) and generally more room for scenery. Pro: less pointwork for easier operation and longer trains possible. Con: uh, less track?
-norm