logging area ?
#1
I have this area where I am thinking about putting this sawmill and out buildings.

<!-- m --><a class="postlink" href="http://www.walthers.com/exec/productinfo/933-3058">http://www.walthers.com/exec/productinfo/933-3058</a><!-- m -->

<!-- m --><a class="postlink" href="http://www.walthers.com/exec/productinfo/933-3144">http://www.walthers.com/exec/productinfo/933-3144</a><!-- m -->

I am totally new to logging of any kind, so I was hoping somebody could advise me on how to arrange the buildings and how many tracks I might need. I am thinking two tracks, one for the loaded and empty log cars and one for box cars for the finished lumber and hoppers for chips.
ON the diagram, the area is the 2 by 4 ft area on the bottom. The track on the left will be approximately 4 to 6 inches above the area.
Thanks for any help.

Loren


Attached Files Image(s)
   
I got my first train when I was three,
put a hundred thousand miles on my knees.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)