Lester Perrys scratch build 09 summer challenge
#1
I am adding a Gern facility to my layout. Some of this is already in existence as a truck manufacturing plant and just needed modification. This transformation actually started before I entered this contest. What has happened so far is not part of my entry as it is only cosmetic, such as signs. The facility already in existence is a simple scratch build from about 12 years ago.
My entry is a part to be added to this. Here are some pics of what I have done to this point. these have been posted earlier in the upper berth, under A FEW PICS GERN IN WV .
[Image: 100_1917a1.jpg]

[Image: 100_1922.jpg]

I am showing this to make sure I am not disqualified on a technicality. Also I have already begun my project a few days ago. So if this is a problem tell me now.I am using some out of the ordinary material. Here is what I have as of now.
[Image: 100_1961.jpg]
This is 2" PVC pipe that I had just collecting dust.

[Image: 100_1962.jpg]
This is what it looks like now.

[Image: 100_1963.jpg]
Plastic Sign I picked up at LHS (local hardware store)

[Image: 100_1964.jpg]
here I now have a top added to it.

[Image: 100_1966.jpg]
Add some steps. and that is all for now.

Stay tuned for more updates
Les
<!-- m --><a class="postlink" href="http://www.lesterperry.webs.com/">http://www.lesterperry.webs.com/</a><!-- m --> Check it out
http://www.youtube.com/lesterperry/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)