12-15-2008, 11:12 AM
Finished the rest of the embankment on the Construction Zone side (left of the bridge). I really like how it turned out. Here are some pics:
So the left side of the bridge is pretty much done as far as the embankment goes, the only thing left to do is add a few trees
So the left side of the bridge is pretty much done as far as the embankment goes, the only thing left to do is add a few trees