"New modules"
#36
On the last trip down the basement stairs, the bridge tender's shack (left side in front of the vertical lifts) "self detached" and crashed down the stairs. All the support structure was totally demolished. I'll have to rebuild that. Amazingly, this is the first major damage in twenty years of transporting the modules!
In the rebuild process, the shack will also get a new shingle roof. The old Campbell Scale "lick and stick" shingle strips, never quite measured up to expectations.
Now that the "Springbash 2010" is done, I can get back to the new modules. The upper level bridges are just about ready for track to be laid. The lower level has dual gauge track in place.
We always learn far more from our own mistakes, than we will ever learn from another's advice.
The greatest place to live life, is on the sharp leading edge of a learning curve.
Lead me not into temptation.....I can find it myself!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)