(Almost) Everything's Negotiable - Help on "G" Layout Design
#7
and - since all you designers love pictures:

Before the hole was cut out. Note "Grades for trestle on right against wall
<!-- m --><a class="postlink" href="http://home.comcast.net/~the-gauge/g/024.jpg">http://home.comcast.net/~the-gauge/g/024.jpg</a><!-- m -->

The Trestle & the second Level. This one also shows the 2 bridges to the left of the picture and the cut out for the second levelk. The "right" hand (inside) bridge can be taked out of the new design.
<!-- m --><a class="postlink" href="http://home.comcast.net/~the-gauge/g/g031.jpg">http://home.comcast.net/~the-gauge/g/g031.jpg</a><!-- m -->

Second level showing tunnel entrances. Yes, That's a water fountain in between the tunnels.. Yes, it's shaded on the second plan above.... It has to stay.....
<!-- m --><a class="postlink" href="http://home.comcast.net/~the-gauge/g/g038.jpg">http://home.comcast.net/~the-gauge/g/g038.jpg</a><!-- m -->

"5 Ft" center area and trestle. If you want to, you can "cut in" to the center area, just leave the area for the trestle... Or, leave the area as-is and move the trestle....
<!-- m --><a class="postlink" href="http://home.comcast.net/~the-gauge/g/g039.jpg">http://home.comcast.net/~the-gauge/g/g039.jpg</a><!-- m -->
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75    
~~ Baldwin Eddystone Unofficial Website

~~ I wonder what that would look like in 1:20.3???
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)