12-10-2009, 11:12 PM
[albumimg]1633[/albumimg]
[albumimg]1632[/albumimg]
Two images of the newly painted baseboard with track set in place. The two structures will come with the layout, although I may wrap them as a gift. We'll see.
Spackle & paint is quiet, as well as setting up the track & outlining with a sharpie, but tacking down roadbed is not. I'll need more time without the #1 kiddo in the house and #2 kiddo is not napping in order to pull that off. Once the roadbed & track have been laid, it'll be time to, er, break-in the trains and troubleshoot the layout.
Galen
[albumimg]1632[/albumimg]
Two images of the newly painted baseboard with track set in place. The two structures will come with the layout, although I may wrap them as a gift. We'll see.
Spackle & paint is quiet, as well as setting up the track & outlining with a sharpie, but tacking down roadbed is not. I'll need more time without the #1 kiddo in the house and #2 kiddo is not napping in order to pull that off. Once the roadbed & track have been laid, it'll be time to, er, break-in the trains and troubleshoot the layout.
Galen
I may not be a rivet counter, but I sure do like rivets!