04-08-2012, 08:27 AM
Here is a pic of the currant status of the layout,it has been moved to a different part of the basement.
We still need to build the end module (one on the left end in the drawing ).Once that is done we can get the track down and get some trains running. Oh,and I replaced the creek module,I just did not like how it was turning out.
We are hoping to have a running layout by the time the NTS starts.
We still need to build the end module (one on the left end in the drawing ).Once that is done we can get the track down and get some trains running. Oh,and I replaced the creek module,I just did not like how it was turning out.
We are hoping to have a running layout by the time the NTS starts.
Johnathan (Catt) Edwards
"The Ol Furrball"
"I'm old school,I still believe in respect"
"The Ol Furrball"
"I'm old school,I still believe in respect"