Charlie b's layout
#64
Gary S Wrote:Alright Charlie B! Thumbsup The roof looks very good.

How will you be getting the electrical wiring to the building? Underground or overhead?

Charlie B Wrote:I'm really ready to run some trains....

I hate to break this to ya, but it will be at least a few days before you are running trains! Wink
Gary, It would be so easy to run it through an overhead conduit. I put a 100 Amp service box in my garage which is 4 foot from this building and the box is in the center of the room, about 10 feet from the outside wall, so I'm 14 ft. from the box to the outside wall of the building, but I think I will run it underground.
The 100 amp service should be enough to power the train room because I will only have lights and heat every now and again, and I have been looking at a windmill that generates DC to charge a battery so I can use an inverter for train operation. This will be way down the road. What do you think?
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: