Team Track Industry
#28
Mr Fixit Wrote:Plus you "have to" just model a donut factory dont you!!!!
At full stretch it was producing 2 Million 50 pound bags of donut mix per year.
Mark
Mark;

I never have been able to find out why Krispy Kreme pulled out of Effingham after only a few years in operation, but at least the facility was taken over by another similar operation. Bunge Foods also left Effingham about the same time, and I'm not sure if the current company is doing much rail business. The down turn in the economy is hurting every one.

The EFRR is one of a handful of "model railroad" size short lines still in operation where a person could pretty much model it in its entirety. I wouldn't call it a "Timesaver", but does require that industries be switched from both directions. Besides not being able to model the line closer to the prototype track arrangement, most of the industries didn't fit with my freight car fleet, which also helped to rule it out. Just going to have a freelance industrial spur, but using a prototype track arrangement.

I've always been really fond of the EFRR's CGW paint scheme. Very nice and they keep the equipment spotless!
Ed
"Friends don't let friends build Timesavers"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)