06-28-2010, 10:11 PM
Its not much to show, but you get the idea lol
I used the all of the remaining Central Valley Tie Strips I had laying around. I will have to order some more of them. But I did have enough to get the right side of the yard laid out. The BNSF Mainline will run along the back, and will be up on roadbed so it will be slightly raised from the rest of the yard. The bottom track in the picture is the siding for Estenson Logistic LLC. The second track from the bottom is the yard lead (which is the blue track on the plan just above Estenson). This track was stopped short, and where it ends the first turnout will be placed.
Ill be ordering the turnouts as well as some more Central Valley Tie Strips and the Concrete Flextrack for the BNSF Mainline i need for module #4 tomorrow, and they should be in sometime next week.
I used the all of the remaining Central Valley Tie Strips I had laying around. I will have to order some more of them. But I did have enough to get the right side of the yard laid out. The BNSF Mainline will run along the back, and will be up on roadbed so it will be slightly raised from the rest of the yard. The bottom track in the picture is the siding for Estenson Logistic LLC. The second track from the bottom is the yard lead (which is the blue track on the plan just above Estenson). This track was stopped short, and where it ends the first turnout will be placed.
Ill be ordering the turnouts as well as some more Central Valley Tie Strips and the Concrete Flextrack for the BNSF Mainline i need for module #4 tomorrow, and they should be in sometime next week.