N Scale switching layout plan help needed PLZ
#15
I like the revision. Since you were not going to use that wide table in front of the interchange/staging track, you are better off with extra space in the room. If you don't have a work area for building models elsewhere, you would have room for a work bench right in front of the staging track & next to the programing track. If you isolate the programing track from the rest of the layout and then install a double pole double throw switch you can use the programing track as part of the layout operationally when not programing. It looks like you have addressed every issue that was raised on your original track plan. Time to start building and have fun with it!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)