09-02-2010, 10:32 PM
A lot of concrete tunnel portals have the date stamped or cast into the top of the portals. Obviously blasted rock portals don't have such a thing. The date on the bridge looks like it was cut or stamped out of the steel, so I suspect that it was done while the bridge was still in pieces waiting for assembly.