Step-By-Step Build Series - Walthers Ashland Rolling Mill
#2
Step 1 involves assembling the 4 base components for the Rolling Mill. As mentioned above, I have rearranged the orientation of the base components. Walthers suggests putting the Rolling Mill Stand and the Machinery in the middle of the structure and tracks on either side, however, most people do not have the room to have tracks coming from both sides of a structure. This way, this structure could be used in a corner.

Pictures of the assembled base with a couple Red Caboose BNSF Coil Cars

[Image: SL370198.jpg]

[Image: SL370199.jpg]

[Image: SL370200.jpg]
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)