10-05-2010, 02:50 PM
Steps 2 & 3 involve assembling the Roller Stand, the Lower Motor and Drive Shaft as well as installing the Platform w/Stairs.
Its pretty basic construction, and painting is done as needed when building.
Its pretty basic construction, and painting is done as needed when building.