Southern Pacific Switching Layout
#40
lajry Wrote:Justin
If those two spots on the bottom are industries to be switched, you need a LH Xover there. As drawn there's no way to get around cars. Also as drawn that's a very switchback that'll get real old real fast to operate.

Those spots at the bottom are just background buildings and will not be rail-served. After I built the benchwork I tried laying out the track according to my plan and it was much too Track-heavy for my taste and so I am still open to ideas.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)