The Hjemstad Line
#15
Sumpter250 Wrote:My only suggestion would be; any pilings, that continue below the water line.....build up on a jig, and use the jig as a drilling pattern for the water surface. Some left over plywood from the "water", could be used for the jig. The completed structure, on its pilings, can then be transferred to the scene, and the pilings set in the holes with some glue. They will not "break free" when the module is moved. I tried this on my new modules, with the bridgetender's walkway, and the boat docks, and I am pleased with the results.

Thanks for the tip, I can use that for the walkway alongside the apron.

I've been browsing your "New Modules" thread, and that is some excellent modelling. Great looking ships! I wanted to have a small cargo ship at the dock by the team tracks on my layout, maybe also a small crane for loading and unloading, but those ships are BIG..!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)