Slate Creek Industrial.
#1
Here is a rough draft of SCI.

[Image: Untitled-5.jpg]


The darker lines is service roads while the thinner lines is the track.

The solid black square is a planned truck parking lot for a small mom & pop type truck stop across the service road.

The smaller gray square is a trailer drop lot for drop and hook service-trailers will be delivered to their final destination by a spotting service.

The design is loosely based on several prototype areas gleamed from Bing maps.

I included a small holding track for spotting outbound cars out of the way.
-------------------------------------
Operations.

As of now not all industries will be switch every operation session.I will rotate the work load.
-----------------------------------
Thoughts.

I am planing a 1978-79 short line that utilizes 2 RS1s for power.

However..

I have had this idea floating around for several years.

I thought about a industry complex that has their own locomotive such as a GE 44 Tonner or A GE 70Tonner-Bachmann makes the 44 Tonner and will be releasing a 70 Tonner in N Scale.
-----------------------------------
Any thoughts or concerns I may have overlooked?
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: