05-14-2013, 12:09 PM
Well, I thought I would post a quick update here.
The Ann Arbor branch, as described above, is no more. I was really beginning to enjoy the layout (enough that I was tough to make progress because I would operate in my free time instead of adding scenic elements)!
I have moved from my apartment into a house, and the basement has compelled me to build a larger layout. I've drafted a track plan here: <!-- m --><a class="postlink" href="http://www.flickr.com/photos/dgaken/8411504201/">http://www.flickr.com/photos/dgaken/8411504201/</a><!-- m -->
Construction is going well, the benchwork is 90% complete and the track is 75% complete. My hope is to have both of these stages done during this coming summer!
The Ann Arbor branch, as described above, is no more. I was really beginning to enjoy the layout (enough that I was tough to make progress because I would operate in my free time instead of adding scenic elements)!
I have moved from my apartment into a house, and the basement has compelled me to build a larger layout. I've drafted a track plan here: <!-- m --><a class="postlink" href="http://www.flickr.com/photos/dgaken/8411504201/">http://www.flickr.com/photos/dgaken/8411504201/</a><!-- m -->
Construction is going well, the benchwork is 90% complete and the track is 75% complete. My hope is to have both of these stages done during this coming summer!