new project
Thanks Gents.. I have a few more to post today.
I added the loading dock, this will be used to load bagged cement into boxcars. The doors are spaced perfectly for 36 foot boxcars, I have a few Train miniature ones that will be converted just for this purpose.    

I also added an addition to one of the kiln buildings. It will get two small stacks sticking out of the roof.    

The next big part of the project is to build the dropdown extension to the eastern part of the plant. This will be the exchange between the LNE and Anna Lines.     It will attach with a hinge to the edge of the layout and fold out of the way when not in use.
 My other car is a locomotive, ARHS restoration crew  
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)