Iron Ore Mine & Steel Mill in N Scale
#18
I got tired of feeling sorry for myself over the pouring floor disaster, so I decided to do some track work. I have a track plan that did up using a track planning program, but it's not until you actually have some structures made that the track needs to interact with, that you find yourself doing some tweaking.

I posted a couple of pics of the trackwork servicing the blast furnaces. I've only tacked the track down so far, this way I know where to drill the holes for the power drops and the turn out point motors before gluing.

[Image: BFtrack.jpg]

[Image: twins.jpg]

One thing that I've now noticed is a barren triangle between the two BFs that I haven't accounted for... any ideas on what may live in here??

[Image: triangle.jpg]

BTW, I've been absolutely blown away by the likes of Val, dotorwayne and other steel modelers on this site, it's very inspirational to have access to such a talented and experience group.

-Dr.J
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)