01-19-2009, 05:25 AM
I got tired of feeling sorry for myself over the pouring floor disaster, so I decided to do some track work. I have a track plan that did up using a track planning program, but it's not until you actually have some structures made that the track needs to interact with, that you find yourself doing some tweaking.
I posted a couple of pics of the trackwork servicing the blast furnaces. I've only tacked the track down so far, this way I know where to drill the holes for the power drops and the turn out point motors before gluing.
One thing that I've now noticed is a barren triangle between the two BFs that I haven't accounted for... any ideas on what may live in here??
BTW, I've been absolutely blown away by the likes of Val, dotorwayne and other steel modelers on this site, it's very inspirational to have access to such a talented and experience group.
-Dr.J
I posted a couple of pics of the trackwork servicing the blast furnaces. I've only tacked the track down so far, this way I know where to drill the holes for the power drops and the turn out point motors before gluing.
One thing that I've now noticed is a barren triangle between the two BFs that I haven't accounted for... any ideas on what may live in here??
BTW, I've been absolutely blown away by the likes of Val, dotorwayne and other steel modelers on this site, it's very inspirational to have access to such a talented and experience group.
-Dr.J