City Limits GE Building
#1
Hi

everybody wants big buildings on the layout, we did it....

inspired through Brooklyns 1st and 2nd Ave, we took the Walthers Building (everybody knows it), kitbashed from 3 kits an building, now ~ 1,5meters long.

The middle track is now a team track, outside the factories area ( now marked of with an fence) with an loading ramp.
here we have the possibility, to park some cars ore switching engines (they are "visable", not "hidden in the fiddle yard).
The track in front with the curve (more the 1 meter radius) leads to the scrap yard, to the central car repair and further on under the module with the highway brigde to the NEC

enjoy the pics


[Image: 020324062009m.jpg]

[Image: p6113946k.jpg]
kindest regards
Amtrak X995
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)