06-23-2011, 09:07 PM
A little more progress: I completed the conveyor housing for the two longer sections and set them on top of the new silos...
Next I'll turn my attention to redoing the structure in between them with the mocked up blocks on top.
Next I'll turn my attention to redoing the structure in between them with the mocked up blocks on top.