08-09-2011, 09:52 AM
ok - now we have the frame completed, time to attach it & run
Attach a 2X4 to the side of the layout as shown below. Screw the hinges to the 2 X 4.
If you have a leg you can build on, like I did - build onto it.
I just used a second 2 x 4 as shown then attached the vertical "bridge" 2 X 4 to that - ending up with 4 2 X 4's counting the layout's leg. Notice I Had to make a cut out on the 1/4" plywood for the top hinge.
Attach a 2X4 to the side of the layout as shown below. Screw the hinges to the 2 X 4.
If you have a leg you can build on, like I did - build onto it.
I just used a second 2 x 4 as shown then attached the vertical "bridge" 2 X 4 to that - ending up with 4 2 X 4's counting the layout's leg. Notice I Had to make a cut out on the 1/4" plywood for the top hinge.
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???