Handlaying HO Gauge Track Using Code 55 Rail
#6
nachoman Wrote:Good to see you here, Harold. And good article. I have been (slowly) handlaying code 55 in HOn3, and have been spiking every other tie on curves, and every 4th tie on straightaways. Do you pre-bend the rail for the curves?

If the geometry of the track is right the rail bends into the right radius between rail joiners.

[Image: 002405_bad_track2.jpg]

The rails in the replaced track on the left only need a few spikes to keep them in gauge. The piece of roadbed on the right had a kink.

I am only spiking every 12-15 ties and it stays in gauge.

Harold
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)