02-09-2012, 02:29 PM
Lumber would work for track 4. I don't know if they run bulkhead flats in Norway for lumber loads, but you could leave the area clear on both sides of track #4 and load lumber there. Put stacks of lumber around the area, but leave room for a forklift to operate. All buildings for the lumber yard would be in the aisle.