Yard as a Layout
#31
While Brakie is still dreaming about his last and perfect to be (very small) layout Paul Dolkos made a wonderful start on his new huge industrial and warehouse switching layout. Model Railroad Planning and MR magazine both covered his awesome Baltimore based new layout.
------------------------------
Paul,Once started the layout can be up and running in 8 hours-including buildings.

How many can say that? Icon_lol

As far as perfect-first layout to match prototype track arrangements in a industrial park instead of another switching layout suffering from hidden time saver track overkill..

I did what some said couldn't be done in my space-1'x10'.

Apparently they overlooked several things. 357

[Image: nssc2.jpg]

Track Atlas C55 and #5 switches.

Designed based on railroadin' and railfanning experiences backed with Goggle and Bing maps industrial park research for wider variation of track designs..
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)