04-19-2012, 08:48 AM
Is this flex track or hand laid ? I was thinking flex track , whereby I would solder joiners on 2 or 3 lengths before laying glue along the roadbed and then affixing the track ....if your configuration allows this . I've also seen other situations where the guy just glues the ballast in place to hold everything down ....don't know how well that works .
Hand laid would be trickier but the Weldbond would hold it easily .
I'm going to be faced with the same situation , soon , on the first part of my new layout ( HO ) . I'm using 1/2" plywood sub roadbed , cork strips for roadbed , and Weldbond to hold the code 100 flextrack .
T
Hand laid would be trickier but the Weldbond would hold it easily .
I'm going to be faced with the same situation , soon , on the first part of my new layout ( HO ) . I'm using 1/2" plywood sub roadbed , cork strips for roadbed , and Weldbond to hold the code 100 flextrack .
T
To err is human, to blame it on somebody else shows management potential.