05-19-2012, 04:02 AM
Mal,Thanks for the update on your new layout.I like it.
For what its worth your Palmetto Spur videos gave me cause to stop and rethink the modern ISL designs for small ISLs and I decided to redesign Slate Creek and add facing point industry switches with a runaround track.This will add to the operation value of the layout. Its still a straight forward design and far from a time wast-ah,ahem, saver.
For what its worth your Palmetto Spur videos gave me cause to stop and rethink the modern ISL designs for small ISLs and I decided to redesign Slate Creek and add facing point industry switches with a runaround track.This will add to the operation value of the layout. Its still a straight forward design and far from a time wast-ah,ahem, saver.
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!