08-02-2012, 02:56 AM
I see. The tracks will be running on a filled bank (like a levee). I assumed you plan to raise the terrain in general up to the track level.
Reinhard
Building the NM&RC
|
« Next Oldest | Next Newest »
|
Messages In This Thread |