Thanks Stein!! I knew there was a way of doing that...

http://binged.it/U7E31Z

That is their main manufacturing facility that you marked Stein, If you go south, railroad West you can see the rail load out. They have a fleet of chip trucks that bring in materials from all over the are and then are taken to their processing center. THey havea steady stream of trucks that move materials between the two sits. I heard at one point they were trying to negotiate for a conveyor system, but form the photos it does not look like they have built it yet.