03-28-2013, 10:51 AM
Time for another update, this time it's about the foundation for the roundhouse. Here's the underside, showing how the inspections pits are built to get some extra depth:
And here's the topside, work in progress. She has used cement based levelling compound with some gray paint mixed into it, the layer is about 1-1.5mm thick. You can see the guiding pins for the walls and divider wall posts. After the floor has been sanded and levelled out, it will be weathered for a more grimy and older look:
Svein
And here's the topside, work in progress. She has used cement based levelling compound with some gray paint mixed into it, the layer is about 1-1.5mm thick. You can see the guiding pins for the walls and divider wall posts. After the floor has been sanded and levelled out, it will be weathered for a more grimy and older look:
Svein