12-08-2012, 06:53 AM
Two air-condition with some piping populate the roof and the former Walthers bakery silos have been lined up and connect via pipes and a support structure with the main building.
and the truck loading made from Pikestuff and two old German cement silos. Paint will be done tomorrow.
and the truck loading made from Pikestuff and two old German cement silos. Paint will be done tomorrow.
Reinhard