02-27-2013, 04:46 AM
And here the promised "somewhat track plan" in form of aerial photos:
module #1:
Work done:
- roof vents and cooling apparatus on both warehouses
- addional fascade as background on rear warehouse
- an additional roof over the truck loading dock of the front warehouse as view blocker
module #2:
- roofs of the foundry plant completed and painted to get rid the plastici look
- more green
- wayside shanty and outhouse
module #3:
The highway overpass with its old horrible painting, this was completely renewed
module #4:
Here the sintering plant will be errected in the furure. The overhead crane is only a stand-in.
module #5:
- warehouse and office building got their final shape.
All these photos were taken about 1 year ago.
And here some just for fun photos:
W&LE Mallett #8007 passes under the bridge
A Canadian guest car.
A completed Tichy Train kit box car, still to be weathered.
A NYC Flexi Van car as guest "back to the future".
Flexi Van on road wheels.
Enjoy.
Lutz
module #1:
Work done:
- roof vents and cooling apparatus on both warehouses
- addional fascade as background on rear warehouse
- an additional roof over the truck loading dock of the front warehouse as view blocker
module #2:
- roofs of the foundry plant completed and painted to get rid the plastici look
- more green
- wayside shanty and outhouse
module #3:
The highway overpass with its old horrible painting, this was completely renewed
module #4:
Here the sintering plant will be errected in the furure. The overhead crane is only a stand-in.
module #5:
- warehouse and office building got their final shape.
All these photos were taken about 1 year ago.
And here some just for fun photos:
W&LE Mallett #8007 passes under the bridge
A Canadian guest car.
A completed Tichy Train kit box car, still to be weathered.
A NYC Flexi Van car as guest "back to the future".
Flexi Van on road wheels.
Enjoy.
Lutz