04-05-2013, 06:33 AM
I'm going to go with the L for now. Probably will use the Progressive Rail plan from Airlake Park in Minnesota as a basis for track planning. My current shelf switcher is 18 inches wide but I think I'll go with 15 wide since I have a stack of hollow core doors that size. And I'm going to try ceiling tiles like Jim Fix did for (sub) roadbed. Thanks for the input!