new layout with no name
#7
One idea might be to make it a chemical company and a ready mix plant. You could use the 2 bay hoppers for the chemical plant and not use the ready mix plant. I have 2 track plans using the 8 pieces of Peco flex track, but I used 2 of the #8 switches. One with the ready mix plant and one without.

[Image: 8793679911_61fed953c4_o.jpg]

[Image: 8793683073_44f516bc52_o.jpg]

Box cars are unloaded on the top track, covered hoppers & tank cars on the middle track, and interchange & storage on the lower track. I would run this as a short line contract industrial switching operation like the Morristown & Erie's Bayshore Terminal Company.
Mike Kieran
Port Able Lines

" If the world were perfect, it wouldn't be " - Yogi Berra.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)