One idea might be to make it a chemical company and a ready mix plant. You could use the 2 bay hoppers for the chemical plant and not use the ready mix plant. I have 2 track plans using the 8 pieces of Peco flex track, but I used 2 of the #8 switches. One with the ready mix plant and one without.
Box cars are unloaded on the top track, covered hoppers & tank cars on the middle track, and interchange & storage on the lower track. I would run this as a short line contract industrial switching operation like the Morristown & Erie's Bayshore Terminal Company.
Box cars are unloaded on the top track, covered hoppers & tank cars on the middle track, and interchange & storage on the lower track. I would run this as a short line contract industrial switching operation like the Morristown & Erie's Bayshore Terminal Company.
Mike Kieran
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.