new layout with no name
#27
Still trying different track plans,i've found a box in the loft which i'd forgot about,it's full of 60' bulkheads and 72' centre beams,going to try and fit them into my plans,might have to be a industrial spur with a team track.

This is why i always allow myself time for planning,before i start the build,you can always change things on paper alot easier.

On another note what is the average size (height) of the"shoe box"type factories,are they made mainly of sheet metals siding on brick bases,or are there poured concrete slab construction??

Ray
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)